Skip to content
draft internal Owner Operations Reviewed 2026-09-29 Review cycle 90 days v0.1

Infrastructure as Code Conventions

Draft: this page was created during portal setup as a starting point. The Operations team should replace the placeholder sections below with approved content, then set status: approved in the frontmatter.

Purpose

How infrastructure code is structured, reviewed and applied.

Scope

To be defined by the Operations team.

Content

To be written by the Operations team.